CCDC 24 and RAIC Document 9: The Contracts Nobody Reads Until Exam Week

Most candidates read CCDC 2 and RAIC Document 6 and stop, yet CCDC 24 and RAIC Document 9 sit on the same official reference list for ExAC Section 4, and one of them is not a contract at all. CCDC 24 is the CCDC's guide to the forms that run CCDC 2. RAIC Document 9 is the standard contract between an architect and a consultant, built to pass Document 6 down one level. In our experience, a few focused hours on each is enough. This guide from Examitect, an independent ExAC prep platform unaffiliated with the CACB, covers the editions, the clauses and how Section 4 asks about them.

Key Takeaways

What to know about CCDC 24 and RAIC Document 9 before Section 4.

  • CCDC 24 is a guide, not a contract. Nobody signs it. It models the forms CCDC 2 calls for, as the CCDC 24 study notes summarize.
  • Document 9 is Document 6 passed down a level. Article A9 flows the prime contract's obligations and rights down to the consultant. See the RAIC Document 9 study notes.
  • Watch the editions. The 2026 Preparation Guide cites CCDC 24 (1996) and RAIC Documents 6 and 9 (2018, revised 2021). Learn the roles, and take clause numbers from CCDC 2 (2020).
  • The forms are examinable. Objective 10.3 asks you to complete a certificate for payment and a change request. The office functions study notes cover the full objective.
  • Read them after the main pair. Our CCDC 2 vs RAIC Document 6 guide covers the two contracts these documents support.

Overview

At a glance

Exam sectionSection 4, about 130 multiple-choice questions in three hours, closed book
Objectives touched9.2, 10.1, 10.2.3, 10.2.4, 10.3 and 12.1.2
CCDC 24Exam cites 1996; we checked 2016 (written for CCDC 2 2008)
RAIC Document 9Exam cites 2018, revised 2021; we checked the 2022 Digital Edition
Reading time (our estimate)2 to 4 hours for CCDC 24, 2 to 3 hours for Document 9

What are CCDC 24 and RAIC Document 9?

CCDC 24: a guide with no signatories

The 2016 edition is titled "A Guide to Model Forms and Support Documents (for use with CCDC 2 - 2008)". Its introduction says it exists to help users meet the administrative requirements of CCDC 2. For each form it gives a short explanation of the process, a checklist of what the form should contain and a model form.

It is published by the Canadian Construction Documents Committee, the national joint committee formed in 1974 whose four constituent organizations include the RAIC. There are no parties to CCDC 24: its forms are used by the Owner, the Consultant and the Contractor under CCDC 2. Users may reproduce the model forms, except the standard forms CCDC 11, 12, 9A and 9B in its appendices.

RAIC Document 9: the architect's contract with a consultant

The 2022 Digital Edition is the "Canadian Standard Form of Contract between Architect and Consultant". The parties are the Architect (Article A2) and the Consultant (A3), engaged for "This Part of the Project" (A4) under the architect's existing contract with the Client, which A7 names the Prime Contract.

CHOP 2.3 (Consultants) recommends Document Nine for engineering consultants and other design professionals, such as landscape architects and interior designers, and says it is not a stand-alone agreement: Document Six, or its relevant portions, should be appended. Article A8 does exactly that, attaching the Prime Contract as Appendix 1 with fee provisions optionally redacted.

Put together: Document 6 binds client and architect, Document 9 binds architect and consultant, CCDC 2 binds owner and contractor with the architect as Consultant, and CCDC 24 supplies CCDC 2's paperwork.

Which editions does the ExAC cite?

Appendix 3 of the 2026 ExAC Preparation Guide (pp. 30 to 33) lists the references, and the ExAC Framework Document (p. 6) says every item's accuracy is supported by them. Those editions are older than the copies we checked.

DocumentCited in the Prep GuideEdition checked for this post
CCDC 241996, "Guide to Using Model Forms and Supporting Documents" (p. 33)2016, "for use with CCDC 2 - 2008"
RAIC Document 92018 (revised 2021), "between Architect and Engineer or Other Consultant" (p. 31)2022 Digital Edition, revised 2022-08, "between Architect and Consultant"
RAIC Document 62018 (revised 2021) (p. 31)2022 Digital Edition, revised 2022-08
CCDC 22020 (p. 33)2020

The Canadian Construction Association reports that a 2022 edition of CCDC 24 replaced the 2016 edition, is aligned with CCDC 2 (2020) and adds cash allowance expenditure and Ready-for-Takeover application forms.

We could not open the 1996 guide, so every CCDC 24 detail below comes from the 2016 edition and every Document 9 clause from the 2022 Digital Edition. Our advice: learn what each document is for and who prepares, signs and receives it, since those roles follow from the CCDC 2 definitions, and take clause numbers from CCDC 2 (2020), the edition the exam cites.

One example of drift: the 2016 guide says CCDC 2 (2008) does not require a CCDC 9A statutory declaration with progress applications, while CCDC 2 (2020), paragraph 5.2.7, requires one with each application after the first payment.

CCDC 24: the paperwork behind CCDC 2

The 2016 guide groups its forms by process, from prequalification to warranty. The right-hand column gives the CCDC 2 (2020) provision each form serves; the guide itself cites 2008 numbers.

FormWho does what (CCDC 24, 2016)CCDC 2 (2020)
Contractor's Qualification Statement (CCDC 11)Contractor states capacity, skill and experience to the ConsultantPrequalification, before bidding
Project Financial Information (CCDC 12)Owner gives evidence of financial arrangementsGC 5.1
Application for Payment, Schedule of ValuesContractor submits to the Consultant; schedule of values at least 15 calendar days before the first applicationGC 5.2
Certificate for PaymentConsultant certifies and forwards it to the OwnerGC 2.2, GC 5.3
Statutory declarations (CCDC 9A, 9B)Contractor, and subcontractors, swear previous payments were distributed5.2.7, GC 5.4
Supplemental InstructionConsultant issues to the Contractor, copy to the Owner and other consultants2.2.12
Proposed ChangeConsultant asks the Contractor for price and time; do not proceed yet6.2.1
Change OrderRecommended by the Consultant, approved by the Owner and the Contractor6.2.2
Change DirectivePrepared by the Consultant, issued by the Owner, acknowledged by the ContractorGC 6.3
NoticeAny party gives Notice in WritingArticle A-6
Warranty NoticeOwner or Consultant notifies the Contractor of a defectGC 12.3

In our view, four points carry most of the exam value:

  • Supplemental Instructions never move price or time. The guide (p. 18) says they record clarifications or interpretations and may not be used if they affect the Contract Price or Contract Time; a Contractor who thinks one does must notify the Consultant in writing (p. 19).
  • A Change Directive comes first, a Change Order can follow. The directive makes the Contractor proceed before price and time are agreed, and the parties can later record their agreement in a Change Order (p. 21).
  • Copies follow a routine. For a Change Order, the Consultant prepares and signs three copies, the Owner signs and returns them, the Consultant sends them to the Contractor, and the Contractor returns two (p. 25).
  • Contingency allowances change the arithmetic. Changes charged to a contingency allowance leave the Contract Price unchanged while spending stays under the allowance, and adjust it by the difference once spending exceeds it (p. 25).

CHOP 6.8 (Sample Forms) points to CCDC 24 for almost every form it lists. Our post on shop drawings, RFIs and site instructions covers the site side of the same paperwork.

RAIC Document 9: Document 6 passed down one level

Document 9 reads like a shorter Document 6, because much of it is. It takes its definitions from the Prime Contract, adding a few such as "This Part of the Project", the elements or systems the consultant's discipline covers. The clauses that matter, from the 2022 Digital Edition:

The flow-down machinery

  • Article A9. To the extent the Prime Contract applies to This Part of the Project, the Architect assumes toward the Consultant the obligations the Client assumes toward the Architect, the Consultant assumes toward the Architect the obligations the Architect assumes toward the Client, and each gets the matching rights.
  • GC 0.1. "Refer to Prime Contract" means the corresponding GC of the Prime Contract with "Consultant" substituted for "Architect" and "Architect" for "Client". GC 6, 7, 11, 14 and 15 use it, so use of documents, standard of care, termination and suspension, dispute resolution and the miscellaneous conditions all come from Document 6.

Coordination and communication

  • GC 1.1. The Consultant coordinates with the Architect and Other Consultants (1.1.4), helps set its share of the cost estimate (1.1.7) and includes the Architect in all communications with the Client, the Constructor and Other Consultants unless authorized otherwise in writing (1.1.8).
  • GC 1.1.9. The Consultant is an independent contractor, responsible for its own methods and means, and is not the Architect's employee, agent or partner.

Cost, construction and money

  • GC 4.2 and A19. If the estimate or lowest compliant bid for This Part exceeds its budget by more than the percentage in A19, the Client chooses to cut scope or quality, and the overage is not due to extraordinary market conditions or other factors the Consultant could not reasonably foresee or control, the Consultant redesigns for no additional fee. Document 6 sets this figure at 15% in its own A19.
  • GC 5. The Consultant assists the Architect in administering the Construction Contract (5.1) and is not the Architect's or the Client's agent for it (5.2). For its part it performs General Review, interprets the contract in the first instance, and may reject work and order special testing (5.3). Its payment recommendation is a representation to the Architect (5.4).
  • A17 and GC 12. The Architect invoices the Client on the Consultant's behalf and pays within the time set by law or a stated number of days after being paid, whichever is earlier. If the Client pays only part, the Consultant gets its allocable share of what was received (12.2).
  • Liability and insurance. Claims are capped at the lesser of available insurance or the A22 amount (9.1), damages are direct only (9.3), and claims-made professional liability runs at least three years after Ready-for-Takeover (A20).

Schedule A comes in five versions (A1 Electrical, A2 Mechanical, A3 Structural, A4 blank, A5 Custom), with each line item marked F1, F2 or F3 for a fixed, percentage or time-based fee, N/A, or C for the Client. Amendments use the Document Nine Supplementary Agreement (A25.2).

RAIC Document 6 vs Document 9 vs CCDC 24

Clause references are to the editions checked: RAIC Documents 6 and 9 (2022 Digital Edition) and CCDC 24 (2016).

QuestionRAIC Document 6RAIC Document 9CCDC 24
What is it?Contract for architectural servicesContract between architect and consultantGuide to model forms
Who signs?Client and ArchitectArchitect and ConsultantNo one; its forms are used under CCDC 2
Stand-alone?Yes, it is the prime agreementNo, Prime Contract attached (A8)No, it serves CCDC 2
Architect's roleProvides services, coordinating professional (GC 1.1.9)Engages the consultant, coordinating professional (GC 3.2.2)Usually the Consultant preparing most forms
During constructionAdministers the Construction Contract (GC 5.1)Consultant assists the Architect (GC 5.1)Supplies the forms for payment, changes and notices
PaymentWithin 30 days of invoice, or sooner by law (A17)Tied to when the Architect is paid (A17, GC 12.2)Contractor applies, Consultant certifies

Watch the word "Consultant". In Document 9 it means the engineer or other consultant hired by the architect. In CCDC 2 (2020) it means the architect or engineer engaged by the Owner to administer the contract. A question that says "the Consultant prepares the Change Directive" is talking about the architect.

How CCDC 24 and Document 9 show up on Section 4

The ExAC Framework Document (p. 5) gives Section 4 about 130 multiple-choice questions, and the 2026 Preparation Guide (p. 12) permits code books only in Section 2, so everything here must come from memory. The specific objectives on pp. 20 and 21 of the Guide point straight at these documents:

  • 9.2.2 and 9.2.3: the purpose of the CCDC documents and the responsibilities of the parties.
  • 10.2.3 and 10.2.4: the documentation required to change the contract, and the tasks tied to payment.
  • 10.3.1 to 10.3.3: completing a certificate for payment, a change request and forms such as substantial completion.
  • 12.1.2: the role of in-house and external resources on a project, which is where Document 9 fits in our reading.

The Guide's own sample question (p. 28, objective 10.1.1) asks who prepares a change directive under CCDC 2; the answer is the architect. Practise with items like these, our own examples rather than real exam questions:

  1. Roles. Who signs a Change Order? (The Owner and the Contractor, on the Consultant's recommendation.)
  2. Calculation. Work to date is $400,000, holdback is 10% (our example rate; the real one comes from lien legislation) and the previous certificate paid $270,000. What is payable before taxes? ($400,000 less $40,000, less $270,000, which is $90,000.)

The traps are predictable: a Supplemental Instruction used for extra cost, an engineer treated as the architect's agent on site, or Document 9 described as stand-alone. Our post on where Section 4 candidates lose marks covers the rest.

When an unfamiliar standard form turns up, read it in this order:

Step 1
Name the document type and the parties.

Read the title page and first articles: who signs it, or is it a guide with no signatories?

Step 2
Check the edition and what it was written for.

Look at the cover and footer, the way CCDC 24 (2016) states it is for use with CCDC 2 (2008).

Step 3
Read the definitions first.

Capitalized terms carry the meaning, and the same word can mean a different person in another document.

Step 4
Find what it imports from other documents.

Look for flow-down clauses such as Document 9 Article A9 and GC 0.1.

Step 5
Trace money, time and changes.

Note the fee basis, when payment is due and who signs a change.

Step 6
Read the limits last.

List what each party is not responsible for, the liability cap and how long insurance must run.

Two short reads, followed by practice questions, close a gap many candidates leave open. For the contracts around them, see our posts on project delivery methods, evaluating contractor bids and schedules, change orders and closeout in Section 4.

FAQ

CCDC 24 and RAIC Document 9 FAQ

CCDC 24 is the Canadian Construction Documents Committee's guide to the model forms used to administer CCDC 2, the Stipulated Price Contract. For forms such as the Certificate for Payment, Supplemental Instruction, Change Order and Change Directive, it explains the process, lists what the form should contain and gives a model. It is a guide, not a contract, so it has no parties.

The 2026 ExAC Preparation Guide lists CCDC 24 (1996), "Guide to Using Model Forms and Supporting Documents", in Appendix 3. Later editions exist: the 2016 edition was written for CCDC 2 (2008), and a 2022 edition is aligned with CCDC 2 (2020).

RAIC Document 9 is the Royal Architectural Institute of Canada's standard form of contract between an architect and a consultant, such as an engineer or landscape architect. It is not stand-alone: the architect's prime contract with the client, usually RAIC Document 6, is attached, and the 2022 Digital Edition flows its obligations and rights down to the consultant through Article A9.

RAIC Document 6 is between the client and the architect, while RAIC Document 9 is between the architect and a consultant. Document 9 reuses Document 6 by reference: GC 0.1 swaps "Consultant" for "Architect" and "Architect" for "Client", and GC 6, 7, 11, 14 and 15 simply refer to the Prime Contract.

The Consultant, normally the architect, prepares a Change Directive under CCDC 2 (2020), and the Owner signs it. The CCDC 24 (2016) model form adds a line for the Contractor to acknowledge receipt. The sample question in the 2026 Preparation Guide gives the architect as the answer.

A Supplemental Instruction clarifies or interprets the Contract Documents and cannot change the Contract Price or Contract Time. A Change Directive orders a change in the Work within the general scope of the contract before price and time are agreed. If a Contractor believes an instruction affects price or time, CCDC 24 says it must notify the Consultant in writing.

No, a consultant under RAIC Document 9 is not the agent of the architect or the client for the construction contract. GC 5.2 of the 2022 Digital Edition says so directly, and GC 1.1.9 makes the consultant an independent contractor who assists the architect.

No, Section 4 of the ExAC is closed book. The 2026 Preparation Guide permits paper copies of the NBC 2020 and NECB 2020 for Section 2 only and prohibits books, notes and reference documents, so CCDC 24, RAIC Document 9 and every other contract must be learned beforehand.