A worked example, step by step
Illustrative example. The building, dimensions and openings below are our own numbers, not an exam question. The table values are read from the NBC 2020.
A two-storey office building (Group D) has a building area of 900 m² and is sprinklered throughout in conformance with Section 3.2. Its east wall is 20 m long, 4.5 m from the side property line, and the second-storey ceiling is 7.0 m above finished ground. The wall has twelve 1.8 m by 1.5 m windows and one 1.0 m by 2.1 m glazed exit door, none with rated closures.
Step 1
Confirm Part 3 and the major occupancy.Part 9 is limited to buildings of 3 storeys or less with a building area not over 600 m² (Division A, Article 1.3.3.3.). At 900 m², this building is Part 3, and offices are Group D.
Step 2
Measure the limiting distance.Measure at right angles from the face to the property line, street centre line or imaginary line between buildings: 4.5 m.
Step 3
Calculate the area of the exposing building face.Take the wall facing one direction from finished ground to the uppermost ceiling (Article 3.2.3.2.): 20 m x 7.0 m = 140 m².
Step 4
Choose the table.Use Sentence 3.2.3.1.(1): sprinklered throughout and Group D points to Table 3.2.3.1.-D.
Step 5
Read the row and column.Take the first row that covers the face area and the column at or below the limiting distance: 140 m² falls in the "150 or more" row, and 4.5 m reads as the 4 m column. The value is 30%.
Step 6
Check the modifiers.Sentences 3.2.3.1.(5) and (8) and Article 3.2.3.12. apply only to buildings that are not sprinklered, so none changes the 30%. Permitted openings are 30% of 140 m² = 42.0 m².
Step 7
Compare the openings and set the construction.Actual openings are 12 x 2.70 m² + 2.10 m² = 34.5 m², or 24.6%, which is within 30%. Table 3.2.3.7. for 30% permitted (the > 25 to 50% band) requires a 45 min rating, any listed construction type and noncombustible cladding.
Check the lookups in your own copy:
| Lookup | Row | Column | Value |
| Table 3.2.3.1.-D (p. 3-85) | 150 or more m² | 4 m | 30% |
| Table 3.2.3.7. (p. 3-87) | Group D, > 25 to 50% | All columns | 45 min; combustible, encapsulated mass timber or noncombustible; noncombustible cladding |
| Table 3.2.3.1.-B (p. 3-82), comparison | 150 m², less than 3:1 | 4 m | 13% |
Conclusion: the east wall complies, with 7.5 m² to spare. Two traps sit in the last step. Reading the band from the actual 24.6% would wrongly give > 10 to 25% and 1 h. And the Sentence 3.2.3.7.(4) waivers need a limiting distance greater than 5 m, so noncombustible cladding stays unless the assembly complies with Article 3.1.5.5. or 3.1.5.6.
The same wall without sprinklers
Without sprinklers, the route is Table 3.2.3.1.-B. L/H is 20 / 7.0 = 2.9, so the row is 150 m², less than 3:1, and the 4 m column gives 13%, or 18.2 m². The design fails, and the > 10 to 25% band lifts the rating to 1 h. With a slow fire department response, Sentence (8) halves the limiting distance to 2.25 m, read as 2.0 m: 8%, or 11.2 m². A wall that cannot meet the numbers needs a redesign or an NBC alternative solution.