What to ask your firm for
A vague request for "support" is easy to agree to and easy to forget. Hours, dates and amounts give your principal something to approve. These are the five asks we suggest; the numbers are our examples, so scale them to your firm.
| Ask | A specific version (our example) | Why it matters for the exam |
| Paid study time | Two paid hours a week for the 12 weeks before the sitting, booked around deadlines | Our 12-week plan runs six to ten hours a week; paid hours cover part of that load |
| Fee and materials reimbursement | The exam registration fee, a prep subscription and your own NBC 2020 and NECB 2020 paper copies | Fees change, so quote the current amount from exac.ca with receipts or an invoice |
| Flexible hours around the sitting | November 2 and 3, 2026 off, travel time if your test site is far, and no deliverables due that week | The exam takes two full consecutive days, and you must arrive 30 minutes early |
| Mentorship | A licensed architect in the office for a 30-minute check-in every two weeks on code and contract questions | A practitioner can explain the "why" behind a CCDC clause or an NBC lookup |
| Code books and CCDC library | Borrowing CHOP, CCDC 2 (2020), CCDC 24 and RAIC Documents 6 and 9 from the office library | All are on the 2026 Preparation Guide's reference list in Appendix 3 |
Get the right code books
Section 2 is open book, and page 12 of the 2026 Preparation Guide is specific. It permits paper copies of the NBC 2020, without the provincial adaptations, and the NECB 2020. Annotations, highlighting and tabs made beforehand are allowed; added pages and marks made in the room are not. A printed PDF needs the appropriate licence, and any other building code is used at your own risk.
So an office library stocked with your provincial code does not cover the exam: ask for the national editions. Because you will tab and annotate heavily, we suggest asking for personal copies rather than marking up the shared set. Our guide on how to tab the NBC 2020 shows what that involves.
For contracts, Appendix 3 lists CCDC 2 (2020), CCDC 24 (1996) and RAIC Documents 6 and 9 (2018, revised 2021). If your firm administers construction contracts, ask whether these are in the office library. With a principal's permission, a real executed contract, client details removed, is a useful companion to the CCDC 2 study notes.